RIYADH METRO PROJECTS (LINE 3)

Project Brief

CCGC is currently working for Hitachi Rail in Riyadh metro in all the Elevated, Deep Underground and Shallow underground Stations. (22 Station & 2 Depots)

•Having the Scope AFC Cable Pulling Fiber optic cable pulling LV/Telecom panel installation.

•Earthing cable installation

•Signaling Panel installation

•Testing & Termination of Power, Data and FO Cable Installing Low Voltage and Telecom Panels

•Earthing Mesh Installation.

Project Cost: SAR 28 Million

Project Client: Hitachi Rail STS

Project Consultant: Riyadh Metro Transit Consultant (RMTC)