Project Brief
CCGC is currently working for Hitachi Rail in Riyadh metro in all the Elevated, Deep Underground and Shallow underground Stations. (22 Station & 2 Depots)
•Having the Scope AFC Cable Pulling Fiber optic cable pulling LV/Telecom panel installation.
•Earthing cable installation
•Signaling Panel installation
•Testing & Termination of Power, Data and FO Cable Installing Low Voltage and Telecom Panels
•Earthing Mesh Installation.
Project Cost: SAR 28 Million
Project Client: Hitachi Rail STS
Project Consultant: Riyadh Metro Transit Consultant (RMTC)
